GE Power Management
LPS-D Line Protection System
10-
7
10 ALPS TEST PROGRAM
10.2 TEST CALCULATIONS
10
10.2.9 MOB PHASE UNIT
The following dialog box is displayed for this test. The values are the default values used when the user selects
New Test File from the File menu.
Figure 10–10: MOB PHASE UNIT DIALOG BOX
10.2.10 MIG GROUND UNITS – ZONE 1
The following dialog box is displayed for this test. The values are the default values used when the user selects
New Test File from the File menu.
Figure 10–11: M1G GROUND UNITS – ZONE 2 DIALOG BOX
Содержание LPS-D
Страница 2: ......
Страница 4: ......
Страница 164: ...3 14 LPS D Line Protection System GE Power Management 3 3 PRINTED CIRCUIT BOARD MODULES 3 HARDWARE DESCRIPTION 3 ...
Страница 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Страница 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Страница 334: ...A 4 LPS D Line Protection System GE Power Management A 1 FREQUENTLY ASKED QUESTIONS APPENDIXA A ...
Страница 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Страница 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 435: ...GE Power Management LPS D Line Protection System xiii INDEX INDEX tests 6 11 ZONE TIMER functional tests 5 10 ...
Страница 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...