Proline Prosonic Flow 93 PROFIBUS DP/PA
Commissioning
Hauser
89
6
Commissioning
6.1
Function check
Make sure that the following function checks have been performed successfully before switching on
the supply voltage for the measuring device:
• Checklist for "Post-installation check"
• Checklist for "Post-connection check"
!
Note!
When using PROFIBUS PA, please note the following:
• The PROFIBUS interface's technical data must be maintained in accordance with
IEC 61158-2 (MBP).
• A normal multimeter can be used to check the bus voltage of 9 to 32 V and the current
consumption of 11 mA at the device.
6.2
Switching on the measuring device
Once the function check has been performed successfully, the device is operational and can be
switched on via the supply voltage. The device then performs internal test functions and the
following messages are shown on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an appropriate error message is displayed, depending on the cause.
Messages: PROFIBUS DP
Messages: PROFIBUS PA
PROSONIC FLOW 93
START-UP
RUNNING
Startup message
PROSONIC FLOW 93
START-UP
RUNNING
Æ
Æ
PROSONIC FLOW 93
DEVICE SOFTWARE
V XX.XX.XX
Current software version
Software
PROSONIC FLOW 93
DEVICE SOFTWARE
V XX.XX.XX
Æ
Æ
PROFIBUS DP
RELAY OUTPUT 1
RELAY OUTPUT 2
STATUS INPUT 1
Existing input/output modules
Input/output modules
PROFIBUS PA
Æ
Æ
SYSTEM OK
→
OPERATION
Beginning of normal
measuring mode
SYSTEM OK
→
OPERATION
Содержание Proline Prosonic Flow 93
Страница 2: ......
Страница 168: ...www endress com worldwide BA00076D 06 EN 13 10 71121236 FM SGML6 0 ProMoDo...