Proline Prosonic Flow 93 PROFIBUS DP/PA
Installation
Hauser
51
11. Insert the sensor holders into the first pair of drillholes and align with the tie rod (alignment
tool). Spot-weld with the wedding apparatus and then permanently weld both sensor holders.
!
Note!
To align the tie rod, two guide bushings must be screwed onto the sensor holders.
A0001166
Fig. 58:
Installing the dual-path measuring sensors, step 11
12. Weld in both sensor holders.
13. Check the path length, sensor distances and arc lengths once again.
!
Note!
These distances are given as a measurement in Quick Setup. If you determine deviations, note
these down and enter them as correction factors when commissioning the measuring point.
14. Insert the second pair of sensor holders into the two remaining drillholes, as described in
step 12 .
A0001167
Fig. 59:
Installing the dual-path measuring sensors, steps 13 and 14
A0001168
Fig. 60:
Installing the dual-path measuring sensors, step 13
Содержание Proline Prosonic Flow 93
Страница 2: ......
Страница 168: ...www endress com worldwide BA00076D 06 EN 13 10 71121236 FM SGML6 0 ProMoDo...