Proline Prosonic Flow 93 PROFIBUS DP/PA
Installation
Hauser
41
3.10
Installing Prosonic Flow W (Clamp-on)
3.10.1
Installation for measurement via one traverse
Prerequisites
• The installation distances (sensor distance and wire length) are known
16.
• The strapping bands are already mounted
Material
The following material is needed for mounting:
• Two strapping bands incl. mounting bolts and centering plates where necessary
(already mounted
30)
• Two measuring wires, each with a cable lug and a fixer to position the strapping bands
• Two sensor holders
• Coupling fluid for an acoustic connection between the sensor and pipe
• Two sensors incl. connecting cables.
Procedure
1.
Prepare the two measuring wires:
– Arrange the cable lugs and fixer such that the distance they are apart corresponds to the wire
length (SL).
– Screw the fixer onto the measuring wire.
A0001112
Fig. 37:
Fixer (a) and cable lugs (b) at a distance that corresponds to the wire length (SL)
2.
With the first measuring wire:
– Fit the fixer over the mounting bolt of the strapping band that is already securely mounted.
– Run the measuring wire
clockwise
around the pipe.
– Fit the cable lug over the mounting bolt of the strapping band that can still be moved.
3.
With the second measuring wire:
– Fit the cable lug over the mounting bolt of the strapping band that is already securely
mounted.
– Run the measuring wire
counterclockwise
around the pipe.
– Fit the fixer over the mounting bolt of the strapping band that can still be moved.
4.
Take the still movable strapping band, incl. the mounting bolt, and move it until both
measuring wires are evenly tensioned and tighten the strapping band so that it cannot slip.
A0001113
Fig. 38:
Positioning the strapping bands (steps 2 to 4)
1
2
3
4
5
6
7
8
9
10
11
SL
Содержание Proline Prosonic Flow 93
Страница 2: ......
Страница 168: ...www endress com worldwide BA00076D 06 EN 13 10 71121236 FM SGML6 0 ProMoDo...