Installation
Proline Prosonic Flow 93 PROFIBUS DP/PA
48
Hauser
11. Weld in both sensor holders.
12. Check the distance between the drillholes once again and determine the path length.
!
Note!
Determine the path length as follows:
– Via the Quick Setup "Sensor Installation" for measuring devices with local operation.
Run the Quick Setup as described on
90. The path length is displayed in the
SPURLÄNGE function. The transmitter must be installed and connected to the power supply
before you can run the "Sensor Installation" Quick Setup.
– As explained on
90 for transmitters without local operation.
13. Screw the sensors into the sensor holders by hand. If you use a tool, the maximum torque
permissible is 30 Nm.
14. Insert the sensor cable connectors into the opening provided and manually tighten the
connectors to the stop.
A0001129
Fig. 52:
Installing the measuring sensors, steps 11 to 14
Содержание Proline Prosonic Flow 93
Страница 2: ......
Страница 168: ...www endress com worldwide BA00076D 06 EN 13 10 71121236 FM SGML6 0 ProMoDo...