5000 Series Layer 2/3 Managed Data Center Switch CLI Reference Guide
842
Parameters
all
(Optional) Display all (best and non-best) routes.
Default
The default is None.
Command Mode
•
Privileged EXEC
•
User EXEC
Example
The following is an example of the CLI display output for the command.
(Routing)#show ipv6 route summary
Connected Routes................................. 4
Static Routes.................................... 0
6To4 Routes...................................... 0
BGP Routes....................................... 10
External......................................... 0
Internal......................................... 10
Local............................................ 0
OSPF Routes...................................... 13
Intra Area Routes................................ 0
Inter Area Routes................................ 13
External Type-1 Routes........................... 0
External Type-2 Routes........................... 0
Reject Routes.................................... 0
Net Prototype Routes............................. 10004
Total routes..................................... 17
Best Routes (High................................ 17 (17)
Alternate Routes................................. 0
Route Adds....................................... 44
Route Deletes.................................... 27
Unresolved Route Adds............................ 0
Invalid Route Adds............................... 0
Failed Route Adds................................ 0
Hardware Failed Route Adds....................... 4
Reserved Locals.................................. 0
Unique Next Hops (High).......................... 8 (8)
Next Hop Groups (High)........................... 8 (8)
ECMP Groups (High)............................... 3 (3)
ECMP Routes...................................... 12
Truncated ECMP Routes............................ 0
ECMP Retries..................................... 0
Routes with 1 Next Hop........................... 5
Routes with 2 Next Hops.......................... 1
Содержание 5000 Series
Страница 1: ...Draft 1 2 1 ...
Страница 141: ...5000 Series Layer 2 3 Managed Data Center Switch CLI Reference Guide 135 ...