
9
9
9-173
9-173
Installation > [TYPE-1] > Installation Procedure
Installation > [TYPE-1] > Installation Procedure
[TYPE-1]
Option HDD (1TB)
Checking the Contents
[1] HDD Support Pate X 1
[2] HDD X 1
[3] Vibration-prevention
Dumper X 4
[4] Spacer X 4
[5] Screw
(W sems; M3x14) X 4
[6] Screw (TP;M3x6) X 2
[7] Gasket X 1
<CD/Guides>
• Notice for FCC/IC
Check Items when Turning OFF the Main Power
Check that the main power switch is OFF.
1) Turning off the Main Power Supply Switch of the Host Machine.
2) Check that the display on the Control Panel and the Main Power Supply Lamp are turned
off before disconnecting the outlet.
F-9-439
Installation Procedure
1) Assemble the option HDD (1TB).
• 1 Option HDD
• 1 HDD Support Pate
• 4 Dust-prevention Dumpers
• 4 Spacers
• 4 Screws (W sems; M3x14)
NOTE:
When tightening the screen, be sure to align the screw holes by lifting the HDD.
HDD
HDD Support Plate
Anti-vibration Damper
F-9-440
x4
Option HDD
HDD Support Plate
Spacer
Vibration-prevention Dumpe
F-9-441
Содержание imageRUNNER ADVANCE C5255
Страница 17: ...1 1 Product Overvew Product Overvew Product Lineup Feature Specification Name of Parts Operation ...
Страница 310: ...3 3 Periodical Service Periodical Service Consumable Parts Replacement Parts and Cleaning Parts Cleaning Parts ...
Страница 528: ...5 5 Adjustment Adjustment Main Controller Image Formation System Pickup Feed System ...
Страница 692: ...7 7 Error Jam Alarm Error Jam Alarm Overview Error Code Jam Code Alarm Code ...
Страница 821: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD ...