
9
9
9-16
9-16
Installation > Installation Procedure > Installing the Drum Unit
Installation > Installation Procedure > Installing the Drum Unit
9) Hold down the top surface of each Developing Assembly after removing Dummy Drums.
CAUTION:
Be sure to hold the upper side of each Developing Assembly when removing the seal.
Otherwise the cover will be off from its position.
CAUTION:
Make sure to use a new Drum Unit.
If a used Drum Unit (with a blown fuse) is used again, toner is incorrectly supplied and
this becomes a cause of failure.
CAUTION:
Be sure to pay attention to the below in doing the next procedure.
• Do not touch the Drum area.
• Be careful not to hit the cover against the Drum area.
• Do not make the Drum area disposed of light for 5 minutes or more.
NOTE:
Step 10) to 11) is to install the Drum Unit of each color.
F-9-30
CAUTION: Points to Note at Drum Installation
• Be sure not to rotate the Drum counterclockwise while taking it out from the
Container Box, removing the Drum Cover and installing to the main body. The
Scoop-up Sheet may be flipped, causing toner scattering.
• Be sure not to reinstall the removed Drum Cover; otherwise, the Scoop-up Sheet
may be flipped, causing toner scattering.
Drum Cover
F-9-31
F-9-32
Содержание imageRUNNER ADVANCE C5255
Страница 17: ...1 1 Product Overvew Product Overvew Product Lineup Feature Specification Name of Parts Operation ...
Страница 310: ...3 3 Periodical Service Periodical Service Consumable Parts Replacement Parts and Cleaning Parts Cleaning Parts ...
Страница 528: ...5 5 Adjustment Adjustment Main Controller Image Formation System Pickup Feed System ...
Страница 692: ...7 7 Error Jam Alarm Error Jam Alarm Overview Error Code Jam Code Alarm Code ...
Страница 821: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD ...