
9
9
9-69
9-69
Installation > Cassette Heater Unit-37 > Installation Outline Drawing
Installation > Cassette Heater Unit-37 > Installation Outline Drawing
Cassette Heater Unit-37
Checking the Contents (ASIA only)
■
Cassette Heater Unit-37
[1] Cassette Heater Unit X 1
[4] Screw
(
W
Sems Round End; M3x6) X 1
[5] Screw (P Tight; M3x8) X 1
[3] Wire Saddle X 1
[2] Heater Connector Cover X 1
F-9-169
Check Items when Turning OFF the Main Power
Check that the main power is OFF.
1) Turning off the Main Power Supply Switch of the Host Machine.
2) Check that the display on the Control Panel and the Main Power Supply Lamp are turned
off before disconnecting the outlet.
Installation Outline Drawing
F-9-170
Содержание imageRUNNER ADVANCE C5255
Страница 17: ...1 1 Product Overvew Product Overvew Product Lineup Feature Specification Name of Parts Operation ...
Страница 310: ...3 3 Periodical Service Periodical Service Consumable Parts Replacement Parts and Cleaning Parts Cleaning Parts ...
Страница 528: ...5 5 Adjustment Adjustment Main Controller Image Formation System Pickup Feed System ...
Страница 692: ...7 7 Error Jam Alarm Error Jam Alarm Overview Error Code Jam Code Alarm Code ...
Страница 821: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD ...