Program features 61
Smooth pump transitions
The figure below shows the smooth pump transitions with different ramp times.
The timing diagram of Smooth pump transitions shows the pump starting steps. In
this case, the process PID output of the current master has exceeded the start level
(
1. The IPC system starts a new pump after the start delay time (
) is
elapsed.
2. After the motor is magnetized and starts rotating, the new pump accelerates using
quick ramp 1/2 to obtain productive zone.
Note:
This operation is effective only when quick ramp mode is enabled with
parameter
(page
3. The new pump then accelerates along IPC smooth ramp time defined with
parameter
.
4. When a new pump is accelerating, the other pumps decelerate to maintain the
stable output of the system, shown as Normal ramp in the diagram.
5. After the new pump reaches the speed of the current master pump, the new pump
becomes the new master.
6. The new master and all the remaining pumps will start to follow the master drive
speed defined by the process PID of the master drive.
Frequency (Hz)
Time (t)
Starting
speeds
(
Start
delay
(
)
Magnetizing
delay
Start level
Quick ramp 1/2
(
IPC smooth
acceleration
time (
)
Normal ramp
Process PID output
of the current master
Содержание ACQ580
Страница 1: ...ABB drives for water Firmware manual ACQ580 pump control program ...
Страница 4: ... 2017 ABB Oy All Rights Reserved 3AXD50000035867 Rev C EN EFFECTIVE 2017 06 21 ...
Страница 29: ...Start up control with I O and ID run 25 After the ID run is completed text Done is shown on row ID run ...
Страница 30: ...26 Start up control with I O and ID run ...
Страница 40: ...36 Default configuration ...
Страница 304: ...300 Parameters ...
Страница 340: ...336 Additional parameter data ...
Страница 422: ...Contact us www abb com drives www abb com drivespartners 3AXD50000035867 Rev C EN 2017 06 21 3AXD50000035867C ...