6 - 5
–
+
ELEC
IGNITION SYSTEM
EC626002
IGNITION COIL INSPECTION
1. Inspect:
●
Primary coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
Orange lead
1
Tester (–) lead
→
Black lead
2
Primary coil
resistance
Tester selector
position
0.20 ~ 0.30
Ω
at
20 ˚C (68 ˚F)
Ω
×
1
2. Inspect:
●
Secondary coil resistance
Out of specification
→
Replace.
NOTE:
When inspecting the secondary coil resis-
tance, remove the spark plug cap.
CDI MAGNETO INSPECTION
1. Inspect:
●
Pickup coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
Spark plug lead
1
Tester (–) lead
→
Orange lead
2
Secondary coil
resistance
Tester selector
position
9.5 ~ 14.3 k
Ω
at
20 ˚C (68 ˚F)
k
Ω
×
1
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
White lead
2
Pickup coil
resistance
Tester selector
position
248 ~ 372
Ω
at
20 ˚C (68 ˚F)
Ω
×
100
Summary of Contents for WR250F(P)
Page 604: ...5 67 CHAS REAR SHOCK ABSORBER 8 Install Band 1 Taillight connector 2...
Page 692: ......
Page 693: ......