18.
Close the rotor cover and lock the rotor latch. Figure 7-8 shows tubing properly loaded onto a
pump.
Figure 7-8: Tubing properly loaded onto a pump
19.
Repeat steps 15 through 18 to load all four pumps.
20.
Use a flossing technique to load the EC inlet line located on the right side of the EC inlet pump into
the EC fluid detector. Figure 7-9 shows the EC inlet line properly loaded into the EC fluid detector.
Figure 7-9: EC inlet line properly loaded
1
EC inlet line on the right side of the EC inlet pump
2
EC inlet line loaded into the EC fluid detector
21.
Align the notch on the rocker arm to the groove on the rocker assembly.
Load Cell Expansion Set
Quantum
®
Cell Expansion System • Operator's Manual for Software Version 2.1
7-7
Summary of Contents for Quantum Cell Expansion System
Page 1: ...Quantum Cell Expansion System SOFTWARE VERSION 2 1 Operator s Manual...
Page 9: ...vi Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 10: ...1 Preface Quantum Cell Expansion System Operator s Manual for Software Version 2 1 1 1...
Page 19: ...Preface 1 10 Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 20: ...2 Introduction Quantum Cell Expansion System Operator s Manual for Software Version 2 1 2 1...
Page 38: ...3 Touch Screen Quantum Cell Expansion System Operator s Manual for Software Version 2 1 3 1...
Page 60: ...4 Troubleshooting Quantum Cell Expansion System Operator s Manual for Software Version 2 1 4 1...
Page 120: ...9 Washout Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 9 1...
Page 166: ...13 Custom Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 13 1...
Page 172: ...15 Reports Quantum Cell Expansion System Operator s Manual for Software Version 2 1 15 1...