Table 8-7: Step 3 Settings for Coat Bioreactor (continued)
Setting
Factory Default
Setting Options
Outlet
EC Outlet
N/A
Rocker
Stationary (0°)
Same as step 1
Stop Condition
Manual
Manual, Time (0.1 to 2880 min)
4.
Touch
Start
.
5.
Check the status line to confirm that the task has started.
6.
Touch
Finish
when you are ready to complete the task.
7.
Touch
Yes
.
The home screen appears, the system changes to an idle state, and the status line displays Idle.
System Management Tasks
8-10
Quantum
®
Cell Expansion System • Operator's Manual for Software Version 2.1
Summary of Contents for Quantum Cell Expansion System
Page 1: ...Quantum Cell Expansion System SOFTWARE VERSION 2 1 Operator s Manual...
Page 9: ...vi Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 10: ...1 Preface Quantum Cell Expansion System Operator s Manual for Software Version 2 1 1 1...
Page 19: ...Preface 1 10 Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 20: ...2 Introduction Quantum Cell Expansion System Operator s Manual for Software Version 2 1 2 1...
Page 38: ...3 Touch Screen Quantum Cell Expansion System Operator s Manual for Software Version 2 1 3 1...
Page 60: ...4 Troubleshooting Quantum Cell Expansion System Operator s Manual for Software Version 2 1 4 1...
Page 120: ...9 Washout Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 9 1...
Page 166: ...13 Custom Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 13 1...
Page 172: ...15 Reports Quantum Cell Expansion System Operator s Manual for Software Version 2 1 15 1...