22.
Push the rocker assembly into the rocker arm until it is completely inserted. The bioreactor will be
in the home position with the EC inlet and EC outlet ports facing upward and the sample port
facing downward, as shown in Figure 7-10.
Note:
The lines going into the rocker assembly should not wrap around the rocker arm; they should hang
below the bioreactor.
Figure 7-10: Bioreactor in the home position
1
EC inlet and EC outlet ports facing upward
2
Sample port facing downward
23.
Verify that the lines are inserted into the valves correctly.
24.
Hang the waste bag on the bag pole.
25.
Hang the harvest bag on the bag pole.
26.
Check for kinked lines.
27.
Press the tubing line guide onto the pegs located on the top-right side of the incubator door frame
(as you face the mounting plate). Figure 7-11 shows the tubing line guide properly attached.
Figure 7-11: Tubing line guide properly attached
28.
Remove the two blue end caps and the one red end cap from the cell expansion set.
29.
Connect the gas inlet line to the gas quick disconnect located inside the incubator on the
bottom
‑
left side, as shown in Figure 7-12. Rotate the gas inlet line towards the back of the incubator
so it does not hinder the rocker motion.
You should hear a click when you properly connect the gas inlet line.
Set Management Tasks
7-8
Quantum
®
Cell Expansion System • Operator's Manual for Software Version 2.1
Summary of Contents for Quantum Cell Expansion System
Page 1: ...Quantum Cell Expansion System SOFTWARE VERSION 2 1 Operator s Manual...
Page 9: ...vi Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 10: ...1 Preface Quantum Cell Expansion System Operator s Manual for Software Version 2 1 1 1...
Page 19: ...Preface 1 10 Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 20: ...2 Introduction Quantum Cell Expansion System Operator s Manual for Software Version 2 1 2 1...
Page 38: ...3 Touch Screen Quantum Cell Expansion System Operator s Manual for Software Version 2 1 3 1...
Page 60: ...4 Troubleshooting Quantum Cell Expansion System Operator s Manual for Software Version 2 1 4 1...
Page 120: ...9 Washout Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 9 1...
Page 166: ...13 Custom Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 13 1...
Page 172: ...15 Reports Quantum Cell Expansion System Operator s Manual for Software Version 2 1 15 1...