12.
Grasp the top internal mounting clip, bend it up, and rotate the base of the mounting clip
one
‑
quarter turn counter
‑
clockwise to secure the tubing organizer to the mounting plate, as shown
Figure 7-4: Securing the tubing organizer with an internal mounting clip
13.
Repeat step 12 with the bottom internal mounting clip.
14.
Ensure that the rotor latches are unlocked and that the rotor covers on the pumps are open.
Note:
The rotor cover on the EC inlet pump cannot remain open because of hindrance from the incubator wall.
15.
Grasp the blue collar at the base of the tubing that is not attached to the tubing organizer, as shown
in Figure 7-5.
Figure 7-5: Grasping the blue collar
Load Cell Expansion Set
Quantum
®
Cell Expansion System • Operator's Manual for Software Version 2.1
7-5
Summary of Contents for Quantum Cell Expansion System
Page 1: ...Quantum Cell Expansion System SOFTWARE VERSION 2 1 Operator s Manual...
Page 9: ...vi Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 10: ...1 Preface Quantum Cell Expansion System Operator s Manual for Software Version 2 1 1 1...
Page 19: ...Preface 1 10 Quantum Cell Expansion System Operator s Manual for Software Version 2 1...
Page 20: ...2 Introduction Quantum Cell Expansion System Operator s Manual for Software Version 2 1 2 1...
Page 38: ...3 Touch Screen Quantum Cell Expansion System Operator s Manual for Software Version 2 1 3 1...
Page 60: ...4 Troubleshooting Quantum Cell Expansion System Operator s Manual for Software Version 2 1 4 1...
Page 120: ...9 Washout Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 9 1...
Page 166: ...13 Custom Tasks Quantum Cell Expansion System Operator s Manual for Software Version 2 1 13 1...
Page 172: ...15 Reports Quantum Cell Expansion System Operator s Manual for Software Version 2 1 15 1...