250 SL8500 Systems Assurance Guide • June 2011
E24254-01
partitioning
capacities, 204
definition, 35, 203
guidelines, 204
requirements, 206
partner contact sheet, 59
pass-thru port
feature codes, 122
model number, 122
requirements, 103
specifications, 84
pass-thru port planning, 103
Pass-thru Ports
configuration, 22
content management, 139
locations, 2
pass-thru ports
description, 22
pass-thru ports, optional feature code, 122
password
procedure for obtaining, 104
PDUs, 10
philosophy for content management, 135
photo-electric smoke detector, 52, 102
physical
concerns for site planning, 80
placement factors for site planning, 80
physical audit, 18
physical planning, 84
placement of data cartridges, 4
planning
AC power, 90
checklist, 79
physical, 84
shipping weights and dimensions, 109
planning for content, 140, 209
planning meetings, for system assurance, 57
platform configurations, 61
plenum cables, 130
plugs and connectors, 15
plugs, for power, 15
populating the rails, 136
power
AC configurations, 10
accessory rack, 88
configuration drawing, 10
configurations, 10
connections, 15
connectors, 15
distribution units, 10
factors for pre-installation planning, 81
options, 12
planning, 90
plugs, 15
power rails, extractor tool, 107
pre-installation planning
AC power, 90
checklist, 79
physical, 84
shipping weights and dimensions, 109
preparing for the installation, 105
process, for system assurance, xix, 57, 208
PTFs, 148
PTP
installation considerations, 22
PTP management, 139
PTPs
description, 22
requirements, 103
R
rack
descriptions, 25
feature codes, 121
rack hardware kit, 107
rack requirements, 88
RAID configuration, what kind, 68
rail optimization, 136
raised floor loading, 181
ramps or slopes, 79
recirculation, 86
regulatory agencies, 54
remote console, 27
remote site planning, 82
remote support, 116
replacing existing libraries, 69
requirements
for the system assurance process, 57
reserved slots
capacities, 9
riser cables, 130
Robot and Pass-thru Port Power Grid, 13
robot configurations, 19
robot feature codes, 120
robot power supplies, 124
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......