Firmware
Library firmware is installed in the factory and resides on the HBC card, which
can hold
two
separate versions of code:
•
the current activated version
•
the previous or a new downloaded version
When installing code, the HBC card transfers the functional code to the
different controllers in the library (such as the HBT card for the tape drives and
HBB cards for the HandBots).
When upgrading firmware, if for some reason you need to return the library to
the previous version of firmware, a service representative can re-activate it for
library operation.
Firmware Packages:
There are two types of firmware packages for the library:
•
SL8500 code for the library controller and associated library devices
•
StorageTek Library Console application firmware (
SLConsole)
Also know as the Library Console.
Firmware Upgrade:
Upgrading firmware is a three-step process.
Steps 1 and 2 can be done without interruption to library operation.
Step 3 requires an IPL of the library which may take about
10 minutes
.
1. Download the image file (firmware).
2. Activate the downloaded firmware.
3. Reboot the library to make the firmware operational.
Note: An IPL of the new code only takes about 10 minutes if the front door
has not been opened. If you open the front door, both an IPL and an
Audit are required. After the initialization period, the audit is performed
in the background.
For more instructions about upgrading firmware, refer to the online help
documentation or user’s guide.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...