E24254-01
Index 247
Index
53, 102
firmware, 17
downloading, 17
flash memory versions, 16
firmware upgrade, 17
flash memory, 16
flash memory, discussed, 16
float
enabling, 139
optimization, 137
floor
co-planar requirement/tolerance, 93
customer, installation requirements, 106
variations, 93
weight capacity, 92, 106
floor cutouts, 94
floor planning template, 107
floor template, 92
floor tile cut-outs availability, 80
floor tile cutouts for routing, 95, 96
forklifts, 80
Front Frame Power Grid, 13
functional code, 17
G
gaseous limits, 87
H
HandBot configurations, 19
HandBots
workload optimization, 138
handling factors, 79
hardware
tools required for installation, 106
hardware configuration, customers, 69
HBC Card, 16, 100
HBK card, 16
HBT Card, 16, 100
Health Insurance Portability and Accountabil-
ity Act, 165
height of the library, 84
height, library limits
requirement/tolerance, 93
Hewlett-Packard LTO tape drives, 155
High Performance Robotics, 19
HLI–PRC, description of, 5
horizontal pass-thru operations, 22
host connections, 100
host interface connections, 29
host selection, 31, 226
Host Software Component, 42
Hot-Swap indicator, 100
HP
DataProtector, 151
HP LTO
description, 155
HSC
description, 42
feature codes, 152
PTFs, 148
HSC, software compatibility, 41
HTTP Server, 44
Hubbell, plugs and connectors, 15
hubs and switches, 71
HVD, 129
I
IBM LTO
description, 156
IBM TotalStorage 3580 LTO tape drives, 156
ICES, 54
impact testing, 55
inner walls, 4
installation
Library Console, 104
preparing for, 105
site planning checklist, 79
tool kit, 106
installing redundant HandBots, 138
Inter-character Gap for barcode labels, 166
interface
cable routing, 95, 96
cables, 130
connections, 29
types supported, 50
interior lighting, 53
interlocks, 53
internal addresses
description, 5
interoperability, 61
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...