Site Preparation
96 SL8500: Systems Assurance Guide • July 2011
E24254-01
Figure 31. Internal Conduit and Cable Routing
Internal Conduit and
Cable Guidelines
The shaded areas:
Green – Accessory Racks
Yellow – Tape Drives
Red – Power/Electronics
Indicate the areas that you
need to avoid when routing
internal conduit or cables.
If the fire suppression
cutouts (A,B) are
not
being
used,
flexible
conduit or
cables could be used to
route power connections to
the AC power supply from
above the library.
If the fire suppression
cutouts are being used, an
additional cutout in the frame
(C,D) is needed to route
conduit or cables to the
AC power supply.
Optional routing (D,4) may
be used for clearance;
however, rigid conduit needs
to change to flexible for the
Tape Drive DC power supply
grid.
Obstructions to Avoid:
1.
HBS and internal switches
2.
Accessory racks and
equipment
3.
Tape drive DCPS 1
Cabling to be Aware of:
4.
Tape drive interface and
Ethernet cables
(see
Figure 36 on page
101
)
Note: It is highly recommended that the connection of the library’s AC wiring be done by a licensed electrician
.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...