E24254-01
Chapter 4 Site Preparation 103
Site Preparation
■
Pass-thru Port Planning
Figure 38
shows two examples of three libraries connected with PTPs.
-
Example A shows the LSM numbering as you add libraries to the left.
-
Example B shows the LSM numbering as you add libraries to the right.
To implement the pass-thru port feature, you must have:
•
Accessory racks: 1 rack (required) 2 racks for power redundancy
•
Inter-library Communications kit (PN 314842401)
•
PTP conversion bill and instructions
•
Software upgrade and reconfiguration
Make sure these are at the following levels
or higher
:
•
Library firmware: FRS_1.70 (3.70.00) or higher—current is FRS_2.52
•
Library Console: FRS_2.00 (such as 2.16)
•
ACSLS: 7.1 plus PUT0501 for Near Continuous Operation
•
HSC: 6.0 plus PTFs (minimum) or
HSC: 6.1 which added Near Continuous Operation (NCO).
Figure 38. Pass-thru Port Planning Example
Example A
Example B
In this example, adding another library (C) to the
left
of
the library complex increases the LSM numbering
sequentially.
This is the preferred method.
In this example, adding another library (C) to the
right
of the library complex requires a reconfiguration of
LSM numbering.
Important:
For non-disruptive growth, the preferred method is to add libraries from
right
to
left
. However, the
library can grow in the other direction—from
left
to
right
—but this requires a disruption to
re-configuration the system, re-number the LSMs, and re-IPL the library.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...