Introduction
34 SL8500: Systems Assurance Guide • July 2011
E24254-01
Dual TCP/IP Network Entries Worksheet
When preparing the network and connections—as a best practice—complete
a network entries worksheet for each port of the SL8500 library.
Important:
•
When connecting more than one interface to an SL8500 library, the
connections should be through
different subnets
for redundancy.
If one subnet should fail, communications between the hosts and the
libraries continue over the other subnet.
•
When connecting an interface to Port 2A, a service representative must
configure the routing and possibly assign policies for that port (2A) using
the command line interface.
Note: Port 2B is the default port for the library; no routing tables are
required when connecting to that port.
See
“Host Connections” on page 220
for more information.
•
The ports need to be on different Layer 2 broadcast domains
3
.
Description IP
Address
Po
rt 2B
Host name to Port 2B
HBC Card Port 2B
Gateway Port 2B
Netmask
Po
rt 2A
Host name to Port 2A
HBC Card Port 2A
Gateway Port 2A
Netmask
3.
A broadcast domain is a logical network segment where any computer or other device
connected to the network can directly communicate to any other device on that domain
without having to go through a routing device, provided they share the same subnet
address and are in the same virtual network.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...