Ordering Information
126 SL8500: Systems Assurance Guide • July 2011
E24254-01
Tape Drive Power Supplies
See
“Tape Drives” on page 129
for information about specific drives.
Location and selection of the power supplies depends on the number of tape
drives selected and the type of power configuration (N+1 or 2N). Each pair of
supplies provides enough power to support up to 16 tape drives regardless of
the type of drive.
•
The N+1 power configuration provides
two
load sharing power supplies for
every 16 drives with
one
redundant power supply.
•
The 2N power configuration provides
one
load sharing power supply for
every
four
tape drives.
Note:
The power supplies are hot-pluggable and can be added to the library
without any down time.
Power supply guidelines: (See
Table 68
Load Sharing Power supplies)
•
Drive power 1–16 drives
standard
Order 3 power supplies (2+1 redundant)
•
N+1 Drive Power 17–32 drives
Order 5 power supplies (4+1 redundant)
•
N+1 Drive Power 33–48 drives
Order 7 power supplies (6+1 redundant)
•
N+1 Drive Power 49–64 drives
Order 9 power supplies (8+1 redundant)
•
2N Drive Power 1–16 drives
Order 4 power supplies (2+2 redundant)
•
2N Drive Power 17–32 drives
Order 8 power supplies (4+4 redundant)
•
2N Drive Power 33–48 drives
Order 12 power supplies (6+6 redundant)
•
2N Drive Power 49–64 drives
Order 16 power supplies (8+8 redundant)
Note:
The 2N drive power supplies
require
a 2N Power Configuration.
See
Table 66 on page 123
.
Table 69. Tape Drive Power Supply Order Numbers
Order Number
Description
XSL8500-DR-PWR-Z-N
One Drive Power Supply
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...