E24254-01
Appendix G TCP/IP Connectivity 199
TCP/IP Connectivity
Routing Tables (an example of using the policy routing command)
Notice the netmask for Ports 2A and 2B is /32. This value masks all other bits
except the specific destination (host) IP address of 129.80.51.65 through the
separate and unique gateway (router) IP addresses.
CLI Commands
Addresses
1. Take both ports down.
SL8500> network ip link set dev 2A down
SL8500> network ip link set dev 2B down
2. Add the
IP addresses
and
subnet masks
for both ports.
SL8500> network ip address add 129.80.64.237/23 dev 2A
SL8500> network ip address add 129.80.71.203/23 dev 2B
3. Bring both ports back up.
SL8500> network ip link set dev 2A up
SL8500> network ip link set dev 2B up
Routing
Because this example is using
one
host IP address
into two
SL8500 ports, you
need to use the network ip policy routing commands.
4. Add the policy route for both ports.
SL8500> network ip policy route add 129.80.51.65 via 129.80.65.254 dev 2A
SL8500> network ip policy route add 129.80.51.65 via 129.80.71.254 dev 2B
5. Enable the policies.
SL8500> network ip policy enable dev 2A
SL8500> network ip policy enable dev 2B
No special routing is needed for this configuration for ACSLS or HSC. Refer to
the appropriate ACSLS or ELS/HSC documentation for more information.
Port 2A Routing Table
Destination Gateway
Netmask
129.80.51.65
129.80.65.254
255.255.255.255 (/32)
Port 2B Routing Table
129.80.51.65 129.80.71.254
255.255.255.255 (/32)
SL8500 Routing Table
Destination Gateway
Netmask
129.80.64.0 *
255.255.254.0
(/23)
129.80.71.0
* 255.255.254.0
(/23)
default (2B)
129.80.71.254 0.0.0.0
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...