Fire Suppression Planning
The library does
not
ship with a Fire Suppression System installed, although
features have been incorporated into the library to allow for one.
Professional Services offers fire suppression systems which are installed on
site. Visit the Professional Services Web site for more information about these
services or contact your local Professional Services representative (names
are also listed on this Web site).
Figure 37
shows the accesses for fire suppression planning.
As a standard safety feature, the library comes equipped with photo-electric
smoke detectors that
removes all power from the library
if smoke is detected
in and around the library. Power is restored to the library by resetting the AC
circuit breakers on the power distribution units.
Figure 37. Fire Suppression Ceiling Access
(Viewed from the top of the library)
1.
Drive and Electronics Module:
-
A = 130.5 cm (51.4 in.)
-
B = 117.9 cm (46.4 in.)
-
C = 49.3 cm (19.4 in.)
-
D = 45.5 cm (17.9 in.)
-
E = 5.0 cm (2.0 in.)
2.
Robotics Interface Module:
-
F = 134.4 cm (52.9 in.)
3.
Storage Expansion Module:
-
G = 171.7 cm (67.6 in.)
-
H = 232.7 cm (91.6 in.)
4.
Customer Interface Module:
-
I = 277.6 cm (109.3 in.)
-
J = 50.5 cm (19.9 in.)
-
K = 53.1 cm (20.9 in.)
-
L = 111.5 cm (43.9 in.)
-
M = 114.0 cm (44.9 in.)
Details:
Openings = Two per module that measure 5 cm (2 in.) diameter
Plates = Cover the openings and measure 7 cm (2.75 in.) square and 1 cm (0.48 in.) thick.
These plates are what contractors can use to drill in to for a custom fit of the nozzles.
Screws = Two T25 Torx screws
Nozzle protrusion (clearance) into the library for robotic operation = 1 cm (0.4 in.) from the
top
of the library
Note:
Measurements are without covers and doors.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...