E24254-01
Chapter 1 Introduction 13
Introduction
Load Sharing DC Power Supplies
The SL8500 has
three
DC power grids that supplies 48 VDC to components
throughout the library:
•
The tape drive power grid supports up to 64 tape drives.
•
The robot power grid powers the HandBots and the pass-thru ports.
•
The front frame power grid supplies 48 VDC power to the cartridge access
ports, elevators, turntables, and the service safety door.
Table 6. Load Sharing Power Supplies
Power Supply Type
Quantity
Configuration
1
N+1
2N
16
2 + 1 = 3
2 + 2 = 4
24
3 + 1 = 4
3 + 3 = 6
32
4 + 1 = 5
4 + 4 = 8
40
5 + 1 = 6
5 + 5 = 10
48
6 + 1 = 7
6 + 6 = 12
56
7 + 1 = 8
7 + 7 = 14
64
8 + 1 = 9
8+ 8 = 16
8 tape drives
4 tape drives
4
2 + 1 = 3
2 + 2 = 4
8
4 + 1 = 5
4 + 4 = 8
2 HandBots
1 HandBot
1 + 1 = 2
1 + 1 = 2
1 + 1 = 2
2 + 2 = 4
The DC power grids use
load sharing power supplies
. Load sharing allows the
output voltage of one supply to be monitored and adjusted by other supplies
on the bus.
In effect, each independent output voltage is adjusted so that all of the
independent output voltages are the same to evenly distribute the load so if
one output fails or is shorted, it will not bring down the bus.
Table 6
explains the quantity of load sharing power supplies required for each
power configuration and the number of components they power.
Tape drives—from one to:
This allows one supply for every:
Robotics
This allows one supply for every:
Front frame components
Electronics control module
2
1
Requires the 2N power configuration and matching DC power feature codes.
2
The electronic control module (ECM) power supplies are AC to DC converters and
different from the load sharing power supplies used by the HandBots and tape drives.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...