E24254-01
Chapter 1 Introduction 39
Introduction
Toleration Support for HSC and ELS
To allow a customer to connect to the SL8500 hardware without
redundant electronics or Compat 23.
•
HSC 6.2 PTFs – L1H15HA (MVS)
•
HSC 6.2 PTFs – L1H15H9 (VM)
•
Enterprise Library Software (ELS) Version 7.0 – L1H15HB (MVS)
Notes:
-
Upgrading library firmware can be disruptive to customer operations.
Schedule time with the customer to perform this upgrade.
-
Hosts without the latest level of software (ACSLS or HSC) or without
the latest PUTs and PTFs will not be able to support the redundant
electronics feature.
-
Software and firmware levels can be downloaded and ready in
advance of activation. When the time and upgrade window are
available, these upgrades can be activated.
Preparation can limit down time of the library and operating system.
Preparation
For full redundancy, two things not included within the redundant electronics
conversion bill must be done first to prepare the library.
•
Upgrade of the control software (ACSLS or HSC)
•
Upgrade of the firmware (FRS_6.0)
The third sequence may be done, depending upon you library’s availability.
AC Power
The 2N power configuration supplies the library with redundant AC power.
Installation instructions for this are separate from the redundant electronics
conversion bill.
Library Firmware
Before installing any components for redundant operation, library firmware
must be at FRS_6.0 or greater. Obtain this firmware from one of the following
Web sites:
•
http://dlrequest.sfbay.sun.com:88/usr/login (employees)
•
http://spe.sun.com/spx/control/Login (Authorized service partner)
Controller Card Upgrades
When possible
, upgrade the HBC and HBT controller cards in preparation for
the redundant electronics hardware activation.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...