E24254-01
Chapter 1 Introduction 37
Introduction
Multi-Host Network Entries Work Sheet
When preparing the network and connections—as a best practice—complete
a network entries worksheet for each port of the SL8500 library.
Important:
•
When connecting more than one interface to an SL8500 library or library
complex, the connections should be at least two different subnets for
redundancy.
If one subnet fails, communications between the hosts and the libraries
continue over the other subnets.
•
When connecting an interface to Port 2A, a service representative must
configure routing and possibly assign policies for that port using the
command line interface.
Port 2B is the preferred port for host attachments to the library
,
no routing tables are required when connecting to that port.
•
The ports need to be on different Layer 2 broadcast domains
.
Description
IP Address / Name
Conne
ct
ion
1
HBC Card Port: 2A
❏
2B
❏
Host name
Gateway
Netmask
Conn
ect
ion 2
HBC Card Port: 2A
❏
2B
❏
Host name
Gateway
Netmask
Co
nnec
tion 3
HBC Card Port: 2A
❏
2B
❏
Host name
Gateway
Netmask
Conne
ct
io
n 4
HBC Card Port: 2A
❏
2B
❏
Host name
Gateway
Netmask
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...