Introduction
12 SL8500: Systems Assurance Guide • July 2011
E24254-01
AC Power Options
The SL8500 has
four
external AC power options:
•
200–240 VAC, line-to-line, three phase, 40 Amps, 50–60 Hz,
Delta: mostly
used in the U. S. (One 3-phase input for
each
system PDU)
•
200–240VAC, line-to-neutral, three phase, 24 Amps, 50–60 Hz,
Wye: mostly
used in Europe (One 3-phase input for
each
system PDU)
•
200–240 VAC, single phase, 24 Amps, 50–60 Hz
Three
single-phase inputs are required for
each
system PDU
Notes:
The following notes are highly recommended.
•
Connect to three phase power whenever possible.
•
Have a licensed electrician connect the external power cables.
Delta or Wye?
From the four external AC power options, which one should the customer
use? The following are guidelines that may help:
•
As stated before, connecting to three phase power is
highly
recommended
.
The single-phase power option requires 3 circuits and uses 6 circuits for a
2N power configuration and redundancy. This power option is provided for
customers that do not have access to three phase power.
•
There are two three phase power options to choose from: Delta or Wye.
Delta
When the voltage measured from phase-to-phase is 200–240 VAC,
use a Delta power distribution unit.
Delta PDUs require
four
wires (3-phases plus ground).
If supplied, Delta PDUs do not use neutral (a fifth wire).
Wye
When the voltage measured from phase-to-phase is 380–415 VAC,
use a Wye power distribution unit.
Wye PDUs require
five
wires (3 phases, ground, and neutral).
Neutral (N) is
required
for Wye PDUs.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...