Ordering Information
124 SL8500: Systems Assurance Guide • July 2011
E24254-01
HandBot Power Supplies
The HandBot power supplies plug into the Robot and Pass-thru Port Power
Grid and provide 48 VDC power to the HandBots and pass-thru ports.
Power supply requirements depends on the number of HandBots and the type
of library power configuration (N+1 or 2N).
•
The N+1 power configuration provides
two
load sharing power supplies for
every four HandBots plus
one
redundant power supply.
•
The 2N power configuration provides
one
load sharing power supply for
each
HandBot.
Note:
A 2N power supply requires a 2N Power Configuration.
See
Table 66 on page 123
.
Guidelines: (See
Table 68
Load Sharing Power supplies)
•
Four HandBot power (
standard
power for 4 robots)
Order 3 power supplies (2+1 redundant)
•
Four HandBot power (
optional
power for 4 robots)
Order 4 power supplies (2+2 redundant)
•
Eight HandBot power (
standard
power for 8 robots)
Order 5 power supplies (4+1 redundant)
•
Eight HandBot power (
optional
power for 8 robots)
Order 8 power supplies (4+4 redundant)
Table 67. HandBot Power Supply Order Numbers
Order Number
Description
XSL8500-RB-PWR-Z-N
One Robotic Power Supply
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...