TCP/IP Connectivity
202 SL8500: Systems Assurance Guide • July 2011
E24254-01
Diagnosing TCP/IP Problems
If communication problems arise, problems can be diagnosed by using the
following methods:
1. Use a “sniffer” (a device or program used to trace the network traffic for the
library).
2. Display the port statistics on the switch or hub to which the library is
connected. Search for any errors that were encountered.
3. Run a trace with the library management software that displays host-to-
library packets and transmissions.
Solutions
If possible, use a dedicated private network for host management software-to-
library communication.
If, however, a shared network is required, possible solutions are:
1. Directly connect the library to a switch that filters out undirected
(broadcast) traffic.
2. Place the library on its own subnet—this may protect the library from
receiving broadcast messages.
3. Use a managed switch—this can:
-
Set priorities on ports to supply the host and library with higher priority
-
Provide dedicated bandwidth between the host and library
-
Create a virtual local area network (VLAN) between the host and
library
4. A virtual private network (VPN) can also insulate host-to-library traffic from
other interference, such as irrelevant broadcasts.
Gigabit Ethernet Connections
The SL8500 library does not support native Gigabit Ethernet (Gig-E)
connections.
Remember, the SL8500 network is only between the ACSLS server or ELS/
HSC host and Gig-E communications and speed is not necessary.
When connecting to Gig-E networks, choose a switch or router that can
convert to 100 Mbps for the library.
There is not an issue of what the customer puts on the other side of the server,
host, or library to their clients.
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...