Site Preparation
80 SL8500: Systems Assurance Guide • July 2011
E24254-01
Note:
See
“Shipping Weights and Dimensions” on page 109
for the following questions.
Will there be people available to handle the
number of, size of, and weight of the
shipping pallets?
Yes
❏
No
❏
Depending on the configuration, there
may be up to 20 pallets.
Will there be equipment available to handle
the pallets (forklifts and/or pallet jacks)?
Yes
❏
No
❏
Pallets can be up to 2.4 m (8 ft) long.
Is there a
staging area
where the pallets
can be placed with access to the installation
site?
Yes
❏
No
❏
The minimum working area (
not including
space for the pallets
) is approximately
56 m
2
(600 ft
2
).
Are there doorway or hallway height and
width limitations that may prevent moving
the equipment on the shipping pallets?
Will you need to
unpack
the equipment to
move it to the installation site?
Yes
❏
No
❏
Yes
❏
No
❏
Physical Placement (See
Table 39 on page 84
for weights and measurements)
Note:
The library does not require raised
flooring,
but it is highly recommended.
Does the site have raised flooring?
Has the floor been laser-leveled?
Yes
❏
No
❏
Yes
❏
No
❏
It is
recommended
that the floor be laser-
leveled
before
receiving any equipment.
Does the customer have floor tile cut-outs
available for AC power, Interface cables,
and vented floor tiles?
See
“Floor Cutouts” on page 94
.
Yes
❏
No
❏
Cutouts are placed at the rear corners of
the Drive and Electronics Module. Vented
tiles should be placed in
front
of the
library, not under it.
Does the intended site have enough room
to install and service the equipment?
Yes
❏
No
❏
See
Table 39 on page 84
for clearance
specifications
Can the customer’s floor support the weight
of the library configuration?
Yes
❏
No
❏
The customer’s floor must be capable of
supporting 454 kg (1,000 lb) per
distribution pad.
Are there plans for expansion?
If so, when?
How many
slots
does the customer
currently
have?
How many
storage expansion modules
does the customer
currently
have?
Does the customer want to expand with:
•
Additional expansion modules?
•
Pass-thru Ports?
•
More slots?
•
ACSLS license keys
Yes
❏
No
❏
Date: ______
Slots: _______
SEMs: ______
Yes
❏
No
❏
Yes
❏
No
❏
Yes
❏
No
❏
Slots:______
Can the customer’s floor support the weight
of future expansions?
Yes
❏
No
❏
See
Table 39 on page 84
. for weights and
measurements
Table 38. Site Planning Checklist (Continued)
Question Answer
Comments
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...