Chapter 4 Site Preparation 81
Site Preparation
Is the ceiling above the library clear of
obstructions?
(smoke detectors, sprinklers, vents, etc.)
Yes
❏
No
❏
See
“Ceiling Requirements” on page 97
for more information.
Does the equipment need to move over
carpet? If so, is there protection from
electrostatic discharge (ESD)?
Yes
❏
No
❏
Environmental (See
Table 40 on page 85
for specifications)
Does the site meet the environmental
requirements for:
•
Temperature? and Humidity?
•
Air flow (front and back)?
•
Cooling requirements?
•
Heat generated by
rack equipment
?
Yes
❏
No
❏
Temperature: 16°–32°C (60°–90°F)
Humidity: 20–80%, non-condensing
See
“Air Flow Requirements” on page 86
What is the customer’s computer room:
•
Temperature?
•
Relative Humidity?
Current measurements:
Does the site contain features and
materials that guard against ESD?
Yes
❏
No
❏
E
lectro
S
tatic
D
ischarge precautions
Does the customer have a large dumpster
to dispose of the packing material?
Are there special requirements to dispose
of or recycle the packing material, pallets,
and cardboard?
Yes
❏
No
❏
Yes
❏
No
❏
Depending on the configuration, there
may be up to 20 pallets worth of packing
material.
Is there concern about Seismic or
Earthquake ratings for the SL8500?
Yes
❏
No
❏
See the statement about
“Seismic or
Earthquake Ratings” on page 86
Does the site take precautions to guard
against Airborne Contamination?
Yes
❏
No
❏
ISO 14644-1 Class 8 or 9 environment
See
Airborne Contaminants
Is the computer room cooled with
water-cooled systems?
Yes
❏
No
❏
•
Use of
filters
for chlorinated water
cooling systems is recommended.
•
Non-filtered water can cause copper
to corrode.
Power
Does the intended site meet the power
requirements for of the equipment?
Yes
❏
No
❏
200–240 VAC, 47–63 Hz
Three Phase: Delta or Wye
Single Phase:
if required
Note:
Connecting to three phase power is
highly recommended
.
The single phase power option requires 3 circuits for N+1 and 6 circuits for 2N power configurations.
Have arrangements been made for a
licensed electrician to connect power?
Yes
❏
No
❏
See
“AC Power Planning” on page 90
Does the site have multiple, separate
circuits for power redundancy?
Yes
❏
No
❏
For 2N power configurations only
Does the customer plan to use multiple
branch circuits for redundancy?
Yes
❏
No
❏
Table 38. Site Planning Checklist (Continued)
Question Answer
Comments
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...