Software
148 SL8500: Systems Assurance Guide • July 2011
E24254-01
•
Influence tape allocation to ensure the correct tape drives are selected
•
Intercept mount/dismount and swap messages and translate them to
perform tape hardware functions.
Important:
•
HSC 5.0
and
5.1
are not supported with the SL8500 library.
•
HSC 6.0
with new PTFs is required to support the SL8500 library.
•
HSC 6.1
contains additional support for the SL8500, such as Near
Continuous Operation (NCO) that allows the addition and deletion of
panels, drives, and LSMs for Capacity on Demand without needing to
reconfigure or restart HSC.
•
Large Capacity Library Support
HSC 6.0 and 6.1 currently support 43 panels. The following PTFs are
needed to allow support for up to 67 panels:
•
HSC 6.2
contains additional support for the SL8500 Redundant
Electronics feature.
Redundant Electronics
MVS
VM
■
Enterprise Library Software
Enterprise Library Software (ELS) is the successor to NCS and VTCS and
consolidates HSC, VTCS, ExPR, ExLM, and ExHPDM. To support the
Redundant Electronics feature, it will require:
•
Version 7.0 – L1H15O3 (Support)
•
Version 7.0: L1H15MH (Compat 23)
•
Version 7.0 – L1H15HB (Toleration)
Support
HSC 6.0.0
HSC 6.1.0
HSC
SOS6000 - L1H122N
SOS6100 - L1H121Z
SMS6000 - L1H122M
SMS6100 - L1H121Y
HSC with ExLM needs
these additional PTFs
SOS6000 - L1H12VM
SOS6100 - L1H12VO
SMS6000 - L1H12VN
SMS6100 - L1H12VP
HSC and the Move utility
SOS6000 - L1H12WR
SOS6100 - L1H12WT
Support
6.2 – L1H15O1
6.2 – L1H15O2
Compat 23
6.2 PTFs: L1H15ME
6.2 PTFs: L1H15MF
Toleration
6.2 PTFs – L1H15HA
6.2 PTFs – L1H15H9
Summary of Contents for StorageTek StreamLine SL8500
Page 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Page 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Page 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Page 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Page 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Page 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Page 277: ......
Page 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...