Installation and Connection
31 of 132
Publication S177E V2.0 Issue 12/04
Results of Cable Checks
1
Resistance of Core 1 (A-B)
2
Resistance of Core 2 (Common)
3
Resistance between Core 1 and 2
4
Total Resistance of both Cores [should be the total of (1) and (2)]
5
Screen end to end Resistance
6
Cable to Screen Resistance [should be high]
7
Screen to Earth Resistance [should be high]
8
Capacitance Core to Core
9
Capacitance Core 1 to Screen
10
Capacitance Core 2 to Screen [should be the same as (9)]