7-4
Move / Install
Before moving the machine, raise the Adjuster to the very top.
Adjuster
After the machine is installed, secure the stand in place useing the Adjuster to prevent the machine from moving
around.
Adjuster
Checking for
Carrying-in Route
There is a space that allows you to operate using a heavy equipment like a forklift or a crane.
There is a carrying-in route that the machine can go through without being lifted.
In case that there is a step, the machine can be lifted up by a power lifter or the like.
The width of the route should be more than 2000mm.
In case that the carrying -in route bends at a right angle as a right figure,
the width of the route should be checked with the following formula.
route width B(mm) > 4300(mm) - (route width A(mm) x 0.65)
e.g.) When the route width A is 2000mm, the route width B needs to be more than 3000mm.
Formula of the calculation : 4300mm - (2000mm x 0.65) - 3000
Set it untill the Caster is lifted up slightly.
Make sure to move the machine by more than four people.
route width A
route width B
2000mm
AJ-1000
AJ-1000
Summary of Contents for Advanced Jet AJ-1000
Page 2: ...Revision NO Date Description of Changes Approval Issued 0 2006 7 4 First Edition Kato Mabuchi ...
Page 43: ...2 12 Arrangement Diagram_ Soldering Side ...
Page 51: ...2 20 Arrangement Diagram_ Soldering Side ...
Page 58: ...2 27 It indicates the version of the Heater Board ...
Page 66: ...2 35 It indicates the version of the Pump Drive Board ...
Page 74: ...2 43 It indicates the version of the Sub Board ...
Page 75: ...2 44 CN302 Arrangement Diagram_ Soldering Side ...
Page 76: ...2 45 U650 U700 U750 CN800 CN60 0 ...
Page 288: ......