7-3
4. Remove the bolts fixing the Top Frame, and remove
the Top Frame. Then, remove the rest of the Stays.
(size of bolts : 12mm)
5. Peel off all the films wrapping around the machine.
6. Remove the 4 retainers. (size of bolts : 17mm)
Then, the machine can be unloaded from the skid.
- If you remove the bolts, the Top Frame will fall down.
The Top Frame must be supported by one person
while another is removing the bolts.
- Do not remove the bolts at the Bottom Frame before
the Top Frame is removed. The Top Frame will fall
down.
Summary of Contents for Advanced Jet AJ-1000
Page 2: ...Revision NO Date Description of Changes Approval Issued 0 2006 7 4 First Edition Kato Mabuchi ...
Page 43: ...2 12 Arrangement Diagram_ Soldering Side ...
Page 51: ...2 20 Arrangement Diagram_ Soldering Side ...
Page 58: ...2 27 It indicates the version of the Heater Board ...
Page 66: ...2 35 It indicates the version of the Pump Drive Board ...
Page 74: ...2 43 It indicates the version of the Sub Board ...
Page 75: ...2 44 CN302 Arrangement Diagram_ Soldering Side ...
Page 76: ...2 45 U650 U700 U750 CN800 CN60 0 ...
Page 288: ......