
3-23
1
4
3-5 SUPPLY PUMP REPLACEMENT
Turn off the Sub Power SW. Then, turn off the Printer
Main Power SW.
3
2
<Rear view>
Sub Power SW
Remove the Right I/S Cover, Rear Ink Cartridge Case
Cover and Sub Tank Cover.
Right I/S Cover
Rear Ink Cartridge
Case Cover
Remove the Carriage Cover.
Carriage Cover
Turn on the Sub Power SW for initializing the Pump.
As a result, the Supply Pump is set to Open state and
the Pressure Pump is set to Closed state.
Sub Tank Cover
Dryer Main Power SW
Printer Main Power SW
Summary of Contents for Advanced Jet AJ-1000
Page 2: ...Revision NO Date Description of Changes Approval Issued 0 2006 7 4 First Edition Kato Mabuchi ...
Page 43: ...2 12 Arrangement Diagram_ Soldering Side ...
Page 51: ...2 20 Arrangement Diagram_ Soldering Side ...
Page 58: ...2 27 It indicates the version of the Heater Board ...
Page 66: ...2 35 It indicates the version of the Pump Drive Board ...
Page 74: ...2 43 It indicates the version of the Sub Board ...
Page 75: ...2 44 CN302 Arrangement Diagram_ Soldering Side ...
Page 76: ...2 45 U650 U700 U750 CN800 CN60 0 ...
Page 288: ......