3-34
15
<Rear view>
Flexible Cable
Hook the Flexible Cable to the Flame as shown in the
figure.
Flame
16
Disconnect the all Tubes which are to be iserted into the
Cable Veyor from the Pressure Pumps and pull out the
tubes from the Cable Veyor.
Pressure Pump
<Upper view>
Tube Joint
Insert new Ink Tubes.
Insert the opening end of tube into the Cable Veyor
whichi is to be connected to the Damper later.
Make sure that the shortest tube located in front.
17
Ink Tube
Cable Veyor
<Front view>
Shortest Tube
Carriage Board
Pressure Pump
18
Connect the Ink Tubes to the Pressure Pumps.
O Ring
Tube Joint
Make sure the O Ring is set in the Tube
Joint firmly.
1)
Summary of Contents for Advanced Jet AJ-1000
Page 2: ...Revision NO Date Description of Changes Approval Issued 0 2006 7 4 First Edition Kato Mabuchi ...
Page 43: ...2 12 Arrangement Diagram_ Soldering Side ...
Page 51: ...2 20 Arrangement Diagram_ Soldering Side ...
Page 58: ...2 27 It indicates the version of the Heater Board ...
Page 66: ...2 35 It indicates the version of the Pump Drive Board ...
Page 74: ...2 43 It indicates the version of the Sub Board ...
Page 75: ...2 44 CN302 Arrangement Diagram_ Soldering Side ...
Page 76: ...2 45 U650 U700 U750 CN800 CN60 0 ...
Page 288: ......