
3-2
The necessary adjustments after the replacement of each part, and the referential time for each work are described
as follows.
HEAD REPLACEMENT : 20min. (1 Head)
1. HEAD RANK SETTING
2. THERMISTER CHECK
3. HEAD ALIGNMENT
4. HEAD INFORMATION CLEAR Adj. Time : 40min.
< Total Time : 60min. >
SW POWER SUPPLY REPLACEMENT : 30min.
1. HEATER CHECK Adj. Time : 3min.
< Total Time : 33min. >
MAIN BOARD REPLACEMENT
(including BATTERY INSTALLATION) : 15min.
1. DIP SW SETTING
2. FIRMWARE INSTALLATION
3. SYSTEM PARAMETER INITIALIZE
4. HEAD RANK INPUT
5. SERIAL NUMBER INPUT *1
6. CAP & WIPER CHECK *2
7. CAP HEIGHT ADJUSTMENT
8. SENSOR CHECK
9. LIMIT POSITION & MAX SCAN WIDTH INITIALIZE
10. LINEAR ENCODER SETUP
11. PAPER SIDE SENSOR ADJUSTMENT
12. INK TYPE SETTING
13. HEAD ALIGNMENT (SOFTWARE ONLY)
14. CALIBRATION Adj. Time : 70min.
< Total Time : 85min. >
WIPER REPLACEMENT : 5min.
< Total Time : 5min. >
CAP TOP REPLACEMENT : 30min. (6 pcs.)
< Total Time : 30min. >
CARRIAGE MOTOR REPLACEMENT : 20min.
1. SERVO LOCK CHECK
2. AGING
3. MOTOR HOURS CLEAR Adj. Time : 5min.
< Total Time : 25min. >
SUPPLY PUMP REPLACEMENT : 30min. (1 pc.)
1. PUMP WORKING TIME CLEAR
< Total Time : 30min. >
INK TUBE REPLACEMENT : 80min.
< Total Time : 80min. >
BATTERY REPLACEMENT : 20min.
1. BATTERY FLAG CLEAR *3 Adj. Time : 3min.
< Total Time : 23min. >
ENCODER SCALE REPLACEMENT : 25min.
1. LINEAR ENCODER SETUP Adj. Time : 3min.
< Total Time : 28min. >
TU BOARD REPLACEMENT : 15min. (1 pc.)
< Total Time : 15min. >
CARRIAGE BELT REPLACEMENT : 40min.
1. BELT TENSION ADJUSTMENT
2. CARRIAGE BELT POSITION ADJUSTMENT
(Including AGING)
3. LIMIT POSITION & MAX SCAN WIDTH INITIALIZE
Adj. Time : 20min.
< Total Time : 60min. >
*1 Input the serial number in the [SERVICE MENU]>[SERIAL NO.].
*2 It can be performed in the [SERVICE MENU]>[CAP&WIPER CHECK].
*3 It can be performed in the [SERVICE MENU]>[CLOCK CHECK].
Summary of Contents for Advanced Jet AJ-1000
Page 2: ...Revision NO Date Description of Changes Approval Issued 0 2006 7 4 First Edition Kato Mabuchi ...
Page 43: ...2 12 Arrangement Diagram_ Soldering Side ...
Page 51: ...2 20 Arrangement Diagram_ Soldering Side ...
Page 58: ...2 27 It indicates the version of the Heater Board ...
Page 66: ...2 35 It indicates the version of the Pump Drive Board ...
Page 74: ...2 43 It indicates the version of the Sub Board ...
Page 75: ...2 44 CN302 Arrangement Diagram_ Soldering Side ...
Page 76: ...2 45 U650 U700 U750 CN800 CN60 0 ...
Page 288: ......