Scalar i2000 Installation Guide
253
18
Evenly apply pressure to both ends of the control management blade (CMB) and slide it into bay 2 of
the I/O management unit. As you insert the CMB, the latchhooks will begin to move towards the middle
of the blade. Push the latchhooks towards the middle of the blades and into the lock position. You will
feel the blade pins connect with the I/O management unit’s backplane as the blade locks into place.
Figure 24
I/O Management Unit Bay Layout
CAUTION
Forcing the blade into the bay can cause the pins to bend.
ba
y
1 (
n
ot
us
ed
)
ba
y 3
(f
ir
st FC
I/
O bla
de
)
ba
y
5 (thir
d
FC
I/O bla
de)
ba
y 4 (secon
d FC
I/O bla
de)
ba
y 6
(
no
t
us
ed
)
ba
y 8 (secon
d Eth
e
rnet
cooling assembly
bay 7
(first Ethernet
ba
y 2 (CMB)
ex
pa
ns
io
n blad
e)
ex
pa
ns
io
n bla
de)
Summary of Contents for Scalar i6000
Page 20: ...8 About This Guide and Your Product...
Page 38: ...26 Installing a Stand Alone Control Module...
Page 104: ...92 Installing a Multi Module Library...
Page 156: ...144 Installing Cartridges...
Page 164: ...152 Setting up Your Library for Access...
Page 242: ...230 Configuring the Library...
Page 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Page 318: ...306 Adding Optional Hardware...
Page 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Page 356: ...344 Testing and Calibrating the Digital Level...
Page 362: ...350 LBX Board and Terminator...
Page 380: ...368 Glossary...
Page 384: ...372 Index...