6.5 Loop Test
Confirm that the master station and slave stations are correctly connected with the
Ver.1.10 compatible CC-Link dedicated cables and that data linking can be performed.
Loop test 1 checks the status of communication between the master station and all
slave stations connected to the master station. This test is performed during the
system start-up.
Loop test 2 checks the status of communication between the master station and the
specified slave station. This test is executed when a slave station is added or when an
abnormal termination occurs at loop test 1.
POINT
(1) Do not set the slave station transmission speed to "Auto Following" when
performing a loop test. Set the slave station transmission speed as the same as
that of the master station (156 kbps to 10 Mbps).
An abnormal termination may occur in slave stations with transmission speed
set to "Auto Following" only. In this case, check the cable connection status and
the network line status following the troubleshooting procedure.
(2) The setting of "Standby Master Station No." in Network Parameter is required to
execute Loop test 2 for the standby master station.
(3) When data link has started by the standby master station, Loop test 1 and 2 are
not executable. To perform these loop tests, use GX Works2.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......