15 - 37 15 - 37
15 TROUBLESHOOTING
(b) Precautions on the loop test
• Do not write to buffer memory addresses 5E0
H
and 608
H
.
• Do not concurrently perform loop tests by programs and other
peripherals. If this happens, the loop test may not operate normally.
(2) Obtain transmission speed setting
Checks the transmission speed settings of all stations.
(a) Operation procedure
1) Connect all the modules with Ver.1.10 compatible CC-Link dedicated
cables.
2) Switch the programmable controller CPU switch to "STOP".
3) In GX Works2, select [Diagnostics] and then [CC-Link Diagnostics] and
double-click the "Loop Test" icon.
Test result
4) Select "Obtain transmission speed setting" for Test Type.
5) Click the Execute button.
The transmission speed settings are obtained, and the results are
displayed in "Test result".
(b) Precautions on "Obtain transmission speed setting"
• Do not write to buffer memory addresses 5E0
H
, 5E4
H
, 5F8
H
, 641
H
, 645
H
and 783
H
to 787
H
.
• Do not concurrently obtain transmission speed settings by programs and
other peripherals. If this happens, the "Obtain transmission speed
setting" may not be operated normally.
Do not perform the "Obtain transmission speed setting" at the same time
with the check sheet creation wizard.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......