8 - 63 8 - 63
8 FUNCTIONS
8.3.3 Automatic CC-Link startup
When in a system configuration including not only remote I/O stations but also remote
device stations and intelligent device stations, the CC-Link startup and data refresh are
performed only by powering up the system and without creating a program for it.
Use this function to check the operation when constructing a system. When performing
control, always set the network parameters.
(1) Default parameter settings at automatic CC-Link startup
The following lists the default automatic refresh parameter settings, the network
parameter settings and the buffer memory size specifications for the intelligent
device stations when the automatic CC-Link starts up.
(a) Content of default automatic refresh parameter settings
LCPU Direction
Master
station
X1000 to X17FF
RX0000 to RX07FF
Y1000 to Y17FF
RY0000 to RY07FF
W1E00 to W1EFF
RWr00 to RWrFF
W1F00 to W1FFF
RWw00 to RWwFF
SB0600 to SB07FF
SB0000 to SB01FF
SW0600 to SW07FF
SW0000 to SW01FF
(b) Default network parameter settings
Type Master
station
Mode
Remote Net (Ver.1 Mode)
Transmission Speed
156kbps
Total Module Connected
64 modules
Retry Count
3 times
Automatic Reconnection Station
Count
1 module
Standby Master Station No.
No standby master station specified.
PLC Down Select
Data link stop when a master station CPU error occurs
Scan Mode Setting
Asynchronous
Delay Time Setting
0
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......