15 - 25 15 - 25
15 TROUBLESHOOTING
Detectability
Error code
(hexadecimal)
Error details
Cause of error occurrence (details)
Corrective action
Master station
Local station
B311
Data link stop error
Data link stop (SB0002) was executed
for the station that had stopped a data
link.
Execute Data link stop
(SB0002) for the station that is
performing a data link.
B312
Standby master station
absence error
Forced master to standby master
switching (SB000C) was executed in the
system where no standby master station
exists or in the system where the standby
master station had become faulty.
After starting the data link of the
standby master station, execute
Forced master to standby
master switching (SB000C).
B313
All station fault error
Forced master to standby master
switching (SB000C) was executed in the
system where all stations had become
faulty.
After starting the data link of the
standby master station, execute
Forced master to standby
master switching (SB000C).
B314
Switching target error
Forced master to standby master
switching (SB000C) was executed for
any station other than the master station.
Execute Forced master to
standby master switching
(SB000C) for the master
station.
B315
Forced master station switching
error
Forced master switching (SB000C) was
instructed again while the master station
was being switched to the standby
master station.
Check ON/OFF of Forced
master switching (SB000C).
B317
Network startup setting mode
error
The G(P).RLPASET instruction was
executed for a module whose
parameters have been set by GX
Works2.
The parameter setting was changed
without turning the power supply to the
programmable controller system off and
back on, or resetting the programmable
controller CPU.
Use the G(P).RLPASET
instruction according to the
procedure below.
1. Clear the settings of the
network parameters and
refresh parameters of the
target module using GX
Works2.
2. Set the type of I/O
assignment setting in GX
Works2 to "intelligent".
3. Set switch 4 of the intelligent
function module switch
setting in GX Works2 to
0100
H
.
4. Turn the power supply to the
programmable controller
system off and back on, or
reset the programmable
controller CPU.
B31A Data
linking
Data link has already been started when
the master station duplication error
cancelling is instructed.
Do not instruct the master
station duplication error
cancelling during data linking.
B31B
Transmission speed test
execution error
The transmission speed test was
executed during data link.
Stop Data link and then execute
the transmission speed test.
B31C
B31D
System error
———
Please consult your local
Mitsubishi representative.
B31E
Status logging start error
Logging started while the log was being
cleared.
Execute logging after clearing
the logs.
B31F
Status logging clear error
Log was cleared while logging.
Stop logging and then clear the
logs.
B320
Status logging mode invalid
The logging or log clear was executed In
the remote I/O net mode.
Set to the remote net mode,
and then start the logging or log
clear.
B321 System
error
———
Please consult your local
Mitsubishi representative.
B322
Status logging flash ROM clear
invalid
During data link, the logs were cleared
with "RAM + FlashROM" checked.
Stop the data link and then
clear the logs.
B323
Status logging flash ROM clear
incomplete
Clear of the logs was attempted with
"RAM + FlashROM" checked, but logging
started even though the clear was
incomplete.
Clear the logs again with "RAM
+ FlashROM" checked.
B324
Status logging flash ROM
storage error
The logs were attempted to be stored in
the flash ROM even though the logs
could not be stored in flash ROM.
After clearing the logs with
"RAM + FlashROM" checked,
start logging.
Or, start the logging with “RAM”
checked.
(To the next page)
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......