7 - 1 7 - 1
7 PARAMETER SETTINGS
7 PARAMETER SETTINGS
This chapter explains the parameter settings that are required to perform data link on
the CC-Link.
(1) Parameter setting method
Two kinds of parameter setting are available: using GX Works2 or a dedicated
instruction.
(a) Parameter setting by using GX Works2
Using GX Works2 makes the setting of network parameters and automatic
refresh parameters easier.
The data link is automatically started if GX Works2 is used to set the
parameters.
For details of the GX Works2 operation, refer to the GX Works2 Operating
Manual.
(b) Parameter setting by using a dedicated instruction
It is possible to use the G(P).RLPASET instruction to set the network
parameters of the master station and start the data link. (Refer to Section
9.1.8)
The following table lists the differences between the two setting methods.
Parameter setting by
GX Works2
Parameter setting by
dedicated instruction
Program for setting parameters
Not required
Required
Data Link Disorder
Station Setting
Available N/A
Operation Setting
Block Data Assurance
per Station
Available N/A
Mode
Remote I/O Net Mode
Available
N/A
Standby Master Station No.
Available
N/A
Station Information Setting Remote Station Points
Available
N/A
Remote Device Station Initial Setting
Available
N/A
Availability of
network
parameter
settings
Interrupt Setting
Available
N/A
Availability of automatic refresh parameter settings
Available
N/A
L02CPU
2 or less
The specified number of
modules or less
*2
L26CPU-BT
4 or less
*1
The specified number of
modules or less
*2
Number of L series master/local modules
Head module
4 or less
N/A
Changing the parameter settings while the programmable controller
CPU is running
N/A Available
1 The number of modules includes the built-in CC-Link function.
2 Refer to the following manual for details.
MELSEC-L CPU Module User's Manual (Hardware Design, Maintenance and Inspection)
7
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......