9 - 18 9 - 18
9. DEDICATED INSTRUCTIONS AND PROGRAMMING
(b) The G(P).RIRCV instruction can be executed to multiple intelligent device
stations simultaneously.
Note that concurrent execution of multiple instructions including other
dedicated instruction(s) (refer to Section 9.1) is not allowed to the same local
station or intelligent device station.
Create a program in which a flag remains on until the instruction is
completed.
(c) There are two types of interlock signals for the G(P).RIRCV instruction: the
completion device (D2) and the status display device at completion (D2)+1.
1) Completion device
Turns ON in the END processing of the scan where the G(P).RIRCV
instruction is completed, and turns OFF in the next END processing.
2) Status display device at completion
Turns ON and OFF depending on the completion status of the
G(P).RIRCV instruction.
Normal completion: Stays OFF and does not change.
Abnormal completion: Turns ON in the END processing of the scan
where the G(P).RIRCV instruction is completed, and turns OFF in the
next END processing.
Program
OFF
OFF
RYn
(Request device)
OFF
END processing
OFF
ON
ON
On Abnormal
completion
1 scan
RXn
(Completion device)
OFF
Receive completion
END processing
G(P).RIRCV instruction
Completion device
Status display
device at completion
Normal
completion
END processing END processing
Other end station send ready
(d) Multiple dedicated instructions cannot be executed for the same station.
Since it takes several scans until the processing of the dedicated instruction
is completed, execute the next dedicated instruction after the completion
device has turned ON.
The next dedicated instruction executed before completion of the previously
executed dedicated instruction is ignored.
(e) The basic number of steps of the G(P).RIRCV instruction is 10 steps.
(f) The receive buffer assignment is performed in "Station Information Setting"
of Network Parameter of GX Works2. For more details on setting, refer to
Sections 7.2.2, 7.3.2 and 7.4.2.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......