6 - 7 6 - 7
6 INSTALLATION AND CONNECTION
6.3.1 Wiring check
The following explains how to check the wiring status between the remote I/O and
external devices.
[Example of wiring check]
Specify the "Remote Input(RX)" for the master station to "X1000" and the “Remote
Output(RY)" to "Y1000" in GX Works2.
(a) Checking the wiring between the input module and an external device
1) Turn ON the switch corresponding to the external device "X0," which is
connected to the input module of station number 1.
2) Select [Online] [Monitor] [Device/Buffer Memory Batch] on GX
Works2.
3) Set "X1000" in the "Device Name" field.
4) If X1000 is ON, the connection between the input module and external
device has been properly made.
(b) Checking the wiring between the output module and an external device
1) Select [Online] [Monitor] [Device/Buffer Memory Batch] on GX
Works2.
2) Set "Y1020" in the "Device Name" field.
3) Select the monitor data of "Y1020", and then click "Modify Value".
4) Confirm that "Y1020" is set in the "Device/Label" field, and then click
"ON".
5) If the connection between the output module and external device is
properly made, the indicator lamp corresponding to the external device
"Y00" is lit.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......