App - 45 App - 45
APPENDIXES
(2) Master station (RY) Remote I/O station (output)
This indicates the time from the moment a CPU device turns ON (OFF) until a
remote I/O station output turns ON (OFF).
[Expression]
The meanings of symbols in the table are as follows:
SM :
Master station sequence scan time
LS :
Link scan time
n :
LS÷SM (Digits past the decimal point are rounded up to the
nearest integer.)
Rio : Remote I/O response time
With block guarantee of cyclic data per station
Without block guarantee of cyclic data per station
Calculation
value
Asynchronous mode
Synchronous mode
Asynchronous mode
Synchronous mode
Normal
value
(SM×n)+(LS×1)+Rio (SM×n)+(LS×1)+Rio SM+(LS×1)+Rio
(SM×n)+(LS×1)+Rio
Max. value
(SM×n)+(LS×2)+Rio
(SM×n)+(LS×2)+Rio
SM+(LS×2)+Rio
(SM×n)+(LS×2)+Rio
Calculation example:
Master station sequence scan time of 20ms, link scan time of 3ms, and
remote I/O response time of 1.5ms
With block guarantee of cyclic data per station
Without block guarantee of cyclic data per station
Calculation
value
Asynchronous mode
Synchronous mode
Asynchronous mode
Synchronous mode
Normal
value
(20×1)+(3×1)+1.5
= 24.5ms
(20×1)+(3×1)+1.5
= 24.5ms
20+(3×1)+1.5
= 24.5ms
(20×1)+(3×1)+1.5
= 24.5ms
Max. value
(20×1)+(3×2)+1.5
= 27.5ms
(20×1)+(3×2)+1.5
= 27.5ms
20+(3×2)+1.5
= 27.5ms
(20×1)+(3×2)+1.5
= 27.5ms
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......