15 TROUBLESHOOTING
Description of problem
Check item
Check contents
Check procedure
Corrective action
Check the cable at the faulty
station.
A4-1 Cables
Is there any disconnection, short-
circuit, incorrect wiring, faulty
connection, or status out of
specifications (transmission
distance, distance between
stations, transmission cable,
coexistence of different cables or
FG connection)?
Check the cable of the closest
faulty station from the master
station, when multiple stations are
sequentially faulty to the terminal
of the transmission path. (multiple
stations)
Connect the corresponding cable
properly.
A4-2
Power supply (for
communication)
Is the power off or out of the
range of use?
Check the power supply at the
faulty station.
Set the supplied voltage to within
the specified range.
Check if the transmission cable
and power wiring are separated
enough.
Wire the transmission cable and
power wiring as separated as
possible.
Check if the FG is separated from
the power system GND.
Set FG and the power system
GND apart.
A4-3 Noise
Is there any noise on the
transmission cable?
Reduce the transmission speed
and then check the occurrence
frequency.
Take measures against noise.
Reduce the transmission speed.
A4-4
Startup
Is the startup sequence correct?
Check by changing the startup
sequence of the failure station.
Startup with the procedure
described in the manual of the
corresponding station.
A4-5
Slave station failure
Is the slave station failed?
Replace the failed station and
check the operation.
Fix or replace the failed slave
station.
Some station(s)
cannot be linked
occasionally.
A4-6
Standby master
station
Is the standby master station
controlling the data link?
Check if the master station
switching status is in the standby
master station, with the master
station CC-Link diagnostics.
Reboot the system and set the
control by the master station.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......