App - 71 App - 71
APPENDIXES
(6) Operating procedure of the loop test
[Diagnostics] [CC-Link / CC-Link/LT diagnostics]
1) Select "CC-Link" for "Module Setting".
2) Specify the target master module of loop test for "Module No." or "I/O
Address".
3) Click the Start Monitoring button.
4) Click the Loop Test button.
5) When checking the communication status of all stations
Select "All stations" for "Target station", and click the Execute Test
button.
6) When checking the communication status of specified modules
Select "Selected station No." for "Target station", specify the station
number, and click the Execute Test button.
Summary of Contents for L26CPU-BT
Page 1: ......
Page 2: ......
Page 32: ...3 5 3 5 3 SPECIFICATIONS ...
Page 51: ...4 2 4 2 4 PROCEDURE BEFORE OPERATION 4 ...
Page 61: ...6 4 6 4 6 INSTALLATION AND CONNECTION ...
Page 63: ...6 6 6 6 6 INSTALLATION AND CONNECTION 8 The connection method is shown below ...
Page 70: ...6 13 6 13 6 INSTALLATION AND CONNECTION ...
Page 72: ...6 15 6 15 6 INSTALLATION AND CONNECTION ...
Page 139: ...8 33 8 33 8 FUNCTIONS ...
Page 151: ...8 45 8 45 8 FUNCTIONS ...
Page 246: ...11 9 11 9 11 EXAMPLE OF COMMUNICATION BETWEEN THE MASTER STATION AND REMOTE DEVICE STATIONS ...
Page 311: ...13 2 13 2 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATIONS MEMO 13 ...
Page 321: ...14 10 14 10 14 EXAMPLE OF COMMUNICATION WHEN MOUNTING MODULES ON THE HEAD MODULE ...
Page 326: ...15 5 15 5 15 TROUBLESHOOTING To the next page ...
Page 327: ...15 6 15 6 15 TROUBLESHOOTING To the next page ...
Page 328: ...15 7 15 7 15 TROUBLESHOOTING ...
Page 329: ...15 8 15 8 15 TROUBLESHOOTING 2 Troubleshooting by status logging ...
Page 436: ...App 72 App 72 APPENDIXES 7 Operating procedure of the transmission speed test ...
Page 439: ...App 75 App 75 APPENDIXES MEMO ...
Page 447: ......
Page 448: ......
Page 449: ......